Home · Catalog · Missions · STS-61B
Mission Collection

STS-61B: Building Structures in Space

Atlantis's STS-61B mission, November 26, 1985 to December 3, 1985. Preserved in the spacearchive.ai collection.

OrbiterAtlantis
LaunchedNovember 26, 1985
LandedDecember 3, 1985
Records in archive16

Mission Overview

STS-61B, launched November 26, 1985, deployed three communications satellites and carried out experiments in assembling large structures in orbit, as astronauts built and took apart truss frameworks during spacewalks to learn how future space stations might be constructed.

It was the second flight of Atlantis and one of the busiest deployment missions of the year.

The spacearchive.ai STS-61B collection brings together 16 records from the mission, including mission commentary, launch coverage, and press conferences.

Together they preserve the primary-source record of the mission as it was captured at the time, for research and historical study.

STS-61B in the Archive

A working snapshot of what the collection holds today. The public catalog shows descriptive metadata; full media and transcripts are available through research access.

16Records
16Video
0Audio
12Transcribed
75%Transcribed & indexed

All records in this collection

AST-00481Launch Coverage · 1985-11-26

This recording captures the launch coverage of STS-61B, focusing on the terminal countdown from T-minus 9 minutes to liftoff at 7:29 PM. Key ascent milestones include liftoff at T-minus 0, solid rocket booster separation at T-plus 2 minutes and 6 seconds, and the roll program initiated shortly after liftoff. Notably, this mission features the first flight of the PAM D2 upper stage, enhancing payload capacity to geosynchronous orbit.

AST-00482Press Conference · Nov 1985 (est.)

This press conference following the successful landing of Atlantis highlights the completion of STS-61B, which included the deployment of three satellites, notably one for Mexico. Key speakers included Jess Moore, who emphasized the mission's efficiency and the significance of the Ease Access Experiment for future space station design. Dr. Rodolfo Neri discussed his successful experiments on plant growth in space, while James Rhodes noted the continuous operation of the mid deck electrophoresis system for 220 hours during the mission.

AST-00483Mission Commentary · Nov 1985 (est.)

This recording features on-orbit mission commentary during STS-61B, highlighting astronauts Woody Spring and Jerry Ross as they manipulate a 25-foot heat pipe by connecting two eave beams. The crew is noted to be 41 minutes behind the timeline, but they have enough consumables to extend the EVA if necessary. Additionally, the decision is made to bring the base cluster back into the airlock due to uncertainties about its secure fit, rather than leaving it in the payload bay.

AST-00484Mission Commentary · Nov 1985 (est.)

This recording features on-orbit mission commentary during STS-61B, highlighting astronauts Woody Spring and Jerry Ross as they manipulate the entire access truss structure from the assembly fixture. At approximately 5:44 PM, they begin the removal and repositioning of the truss, demonstrating flexibility in assembly tasks. The crew is noted to be 17 minutes behind the EVA timeline, but they are expected to regain time during the upcoming tasks.

AST-00486Launch Coverage · 1985-11-26

This recording captures the launch coverage of STS-61B, focusing on the terminal countdown from T-minus 9 minutes to liftoff at 7:29 PM. Key ascent milestones include liftoff at T-minus 0, solid rocket booster separation at T-plus 2 minutes and 6 seconds, and main engine cutoff at T-plus 8 minutes and 50 seconds. Notably, this was the third attempt to launch due to prior weather and technical issues, with Flight Director Gary Cohen overseeing the countdown.

AST-00487Video · Nov 1985 (est.)

Descriptive summary pending processing.

AST-00489Video · Nov 1985 (est.)

Descriptive summary pending processing.

AST-00490Video · Nov 1985 (est.)

Descriptive summary pending processing.

AST-00491Video · Nov 1985 (est.)

Descriptive summary pending processing.

AST-01730Launch Coverage · 1985-11-26

This recording captures the launch coverage of STS-61B, focusing on the terminal countdown from T-minus 9 minutes to liftoff at 7:29 PM. Key ascent milestones include liftoff at T-minus 0, solid rocket booster separation at T-plus 2 minutes and 6 seconds, and main engine cutoff at T-plus 8 minutes and 50 seconds. Notably, this mission features the second flight of Atlantis and the first flight of the PAM D2 upper stage, which increases payload capacity to geosynchronous orbit.

AST-01731Launch Coverage · 1985-11-26

This recording captures the launch coverage of STS-61B, focusing on the terminal countdown from T-minus 9 minutes to liftoff at 7:29 PM. Key ascent milestones include liftoff at T-minus 0, solid rocket booster separation at T-plus 2 minutes and 6 seconds, and main engine cutoff at T-plus 8 minutes and 50 seconds. Flight Director Gary Cohen oversees the countdown, which proceeds smoothly without any holds or scrubs, marking a successful launch attempt after previous delays.

AST-01732Mission Commentary · Nov 1985 (est.)

This recording features on-orbit mission commentary during STS-61B, highlighting astronauts Woody Spring and Jerry Ross as they complete six assemblies and disassemblies of the EASE structure. At 7:09 PM, Mission Control confirms their progress and allows them to continue with additional cycles due to being ahead of schedule. The crew discusses their oxygen consumption and the physical demands of their tasks, with Spring working as the low man and Ross as the high man during the assembly process.

AST-01733Mission Commentary · Nov 1985 (est.)

This recording features on-orbit mission commentary during STS-61B, highlighting a telephone call at 5:01 PM between Mexican President Miguel de la Madrid and Payload Specialist Rodolfo Neri. The crew discusses the successful deployment of the Corelo satellite and Neri's ongoing scientific experiments, including seed germination and electropuncture. Additionally, the commentary notes the crew's progress in building the access structure, with Jerry Ross and Woody Spring completing the 10th section ahead of schedule.

AST-01734Mission Commentary · Nov 1985 (est.)

This recording features on-orbit mission commentary during STS-61B, focusing on astronauts Woody Spring and Jerry Ross as they assemble a 25-foot heat pipe by connecting two eave beams. At 5 days, 1 hour, and 41 minutes into the mission, the decision is made to bring the base cluster back into the airlock due to uncertainties about its secure fit. The crew is noted to be 15 minutes behind the timeline, but they have sufficient battery power remaining to complete their tasks.

AST-01735Mission Commentary · Nov 1985 (est.)

This recording features on-orbit mission commentary during STS-61B, highlighting astronauts Jerry Ross and Woody Spring as they complete the assembly of the ninth bay of the access structure, ahead of schedule. At approximately 1 hour and 25 minutes into the EVA, they begin disassembling the first five bays, demonstrating effective teamwork and communication. The crew is noted to be 45 minutes ahead of the timeline, showcasing their efficiency in the assembly tasks.

AST-01956Video · Date TBD

Descriptive summary pending processing.

Open STS-61B in the catalog →

Notable Spoken History

Much of the STS-61B collection has been transcribed and speaker-labeled. Timestamped transcript excerpts will be featured here. Full transcripts are available through research access.

Official Sources

Primary references for STS-61B. spacearchive.ai is an independent archive and is not affiliated with NASA.

Research the STS-61B collection.

Request access to full media and timestamped transcripts, or ask our team to help you locate a specific moment from this mission.